The proposals

Following on from the work carried out, three options were considered, each including a ‘package’ or list of measures.

The three options were put out for public consultation over an eight week period, from 30th July -24th September 2018.  During that time further work was also carried out on the feasibility study. Following the consultation and the feasibility study, additional work has been carried out to help determine the best way forward.  The three options are detailed below:

Option one -  traffic management options

Option two - CAZ within the inner ring road

Option three - CAZ within the outer ring road

Three proposed options for tackling air quality in Derby

On this page: